LOTO Procedure
Step 1: Prepare for Shutdown
- Review task requirements.
- Identify hazards.
- Locate all energy sources.
- Notify affected persons.
- Obtain applicable permits if required.
Step 2: Shut Down Equipment
- Follow normal operating procedures.
- Bring equipment to a controlled stop.
Step 3: Isolate Energy Sources
Examples include:
- Main electrical isolator
- Pneumatic isolation valve
- Hydraulic isolation valve
- Gas supply valve
- Mechanical restraints
Step 4: Apply Locks and Tags
Each worker shall:
- Apply a personal lock.
- Apply an identification tag.
- Confirm lock security.
Tags should identify:
- Name
- Contact details
- Date
- Reason for isolation
Step 5: Release Stored Energy
Examples include:
- Bleed air pressure.
- Release hydraulic pressure.
- Discharge capacitors.
- Lower suspended loads.
- Secure moving components.
Step 6: Verify Isolation
Attempt a normal start-up using operating controls.
Confirm:
- No movement.
- No energisation.
- No pressure release.
Return controls to the safe position after testing.
Step 7: Perform Work
Proceed only after successful verification.
Step 8: Restore Equipment
When work is complete:
- Inspect work area.
- Refit guards and covers.
- Remove tools.
- Confirm workers are clear.
- Each worker removes their own lock.
- Notify affected persons.
- Re-energise equipment.