Step 1: Prepare for Shutdown

  • Review task requirements.
  • Identify hazards.
  • Locate all energy sources.
  • Notify affected persons.
  • Obtain applicable permits if required.

Step 2: Shut Down Equipment

  • Follow normal operating procedures.
  • Bring equipment to a controlled stop.

Step 3: Isolate Energy Sources

Examples include:

  • Main electrical isolator
  • Pneumatic isolation valve
  • Hydraulic isolation valve
  • Gas supply valve
  • Mechanical restraints

Step 4: Apply Locks and Tags

Each worker shall:

  • Apply a personal lock.
  • Apply an identification tag.
  • Confirm lock security.

Tags should identify:

  • Name
  • Contact details
  • Date
  • Reason for isolation

Step 5: Release Stored Energy

Examples include:

  • Bleed air pressure.
  • Release hydraulic pressure.
  • Discharge capacitors.
  • Lower suspended loads.
  • Secure moving components.

Step 6: Verify Isolation

Attempt a normal start-up using operating controls.

Confirm:

  • No movement.
  • No energisation.
  • No pressure release.

Return controls to the safe position after testing.

Step 7: Perform Work

Proceed only after successful verification.

Step 8: Restore Equipment

When work is complete:

  1. Inspect work area.
  2. Refit guards and covers.
  3. Remove tools.
  4. Confirm workers are clear.
  5. Each worker removes their own lock.
  6. Notify affected persons.
  7. Re-energise equipment.
Rating
0 0

There are no comments for now.

to be the first to leave a comment.

1. Which step confirms the machine is safe to work on?