Definitions

Lockout - A device is placed on, around, or through an energy-isolating mechanism to lock it in a safe position.

Tag out - The process by placing an energy-isolating device for an item of plant/equipment in the off position, and a written warning tag is attached. A 'tag out' should be used only when the energy-isolating device is not capable of being locked out, e.g., A small item or power tool.

Lockout-Tag out (LOTO) - A device is placed on, around, or through an energy-isolating mechanism to lock it in a safe position and attach a written warning tag. Locks and Tags must be substantial enough to prevent casual or accidental removal. Locks and tags must also identify the worker applying and be using the device.

Policy

The AMRF recognises its responsibility to provide and maintain a safe workplace, including controlling risks associated with accidental start-up, movement of a machine part or the uncontrolled release of an energy system.

We will endeavor to prevent injury and eliminate hazards associated with a LOTO process by ensuring:

Ÿ   a LOTO procedure is in place; and

Ÿ   LOTO equipment is available for use (e.g., safety tags, locks etc.); and

Ÿ   adequate training, information, instruction, and supervision of LOTO procedures is provided; and

Ÿ   all workers undertaking a LOTO procedure are licensed where required (e.g., electrical); and

Ÿ   safe work procedures, e.g., SOPs for plant and equipment items that need LOTO operations, are developed and put in place.


Responsibilities

We are responsible for ensuring that:

Ÿ   a safe system in place for the management of LOTO procedures; and

Ÿ   standard operating procedures for shutdown-isolation-working under power LOTO for unit-specific plant or equipment instructions. (Document instructions for the LOTO of plant/equipment by engaging with HSR/workers who work with the relevant plant or equipment). These specific instructions must contain the following information:

o   method and order of identifying, locating, isolating, and locking out or tagging out each energy source; and

o   process of verifying a zero-energy state, including testing of the energy state; and

o   method and order of reconnecting each energy source to the system; and

o   workers responsible for the LOTO operation hold current licenses and are fully trained and competent to undertake the task; and

Ÿ   equipment not requiring licensing:

o    workers are trained to safely operate the equipment by a person who is suitably qualified/competent in its operation; and

o    if an experienced person is not available, the worker’s manager must ensure the manufacturer’s operating instructions are available, read and understood by the worker before operation commences; and

o    a Safe Work Procedure shall be explained and demonstrated during the training, including any risk assessment for the equipment; and

o    the workers must demonstrate the safe operation of the equipment under supervision before operating the equipment for LOTO purposes unsupervised.

Managers/Supervisors are responsible for ensuring:

Ÿ   a copy of the procedure is provided to all contractors working at The AMRF before they undertake work; and

Ÿ   the LOTO Procedure is implemented when necessary and, workers are familiar with the procedure:

Ÿ   safe work procedures are explained and demonstrated during LOTO training, including any risk assessment for the equipment; and

Ÿ   the workers can demonstrate the equipment's safe operation under supervision before operating the equipment for LOTO purposes unsupervised.

Workers are responsible for ensuring:

Ÿ   reasonable care for their health and safety; and

Ÿ   reasonable care for the health and safety of others; and

Ÿ   they follow the LOTO procedure at all times.

Contractors

All contractors must comply with this procedure (exceptions agreed only in writing). Contractors are expected to provide all locks, tags, and other devices required for LOTO associated with their contract. No Contractor may work on plant or equipment until they have obtained and applied the required devices.

 

Cause

E.g.,

Cause

E.g.,

Fluid

Water, steam, hydraulic fluid

Mechanical

Gears linkages, rings, flywheels

Gas

Pressurised gases, vacuum

Substance

Volatile substances, radiation

Pneumatic pressure

Compressed air

Electrical

Mains, generator

Rating
0 0